Khobab stands tall in S Africa – All 61 2.3MW Siemens Gamesa turbines erected at Lekela Power project

The developers of the 140MW Khobab wind farm in South Africa have completed turbine installation ahead of schedule.
Installation of the 61 2.3MW Siemens Gamesa hardware started in March and was completed on 8 September.

via Khobab stands tall in S Africa – Onshore Wind | reNEWS – Renewable Energy News

Advertisements