Offshore Wind Energy; 4 X The Energy Potential Of ALL Existing Power Plants In US Today

In the video above, 100 wind turbines were installed in 100 days. The Hoover Dam was built in 5 years from idea to finished product. However, offshore wind energy plans in the US are stuck in a holding pattern. In more than 12 years of planning and environmental review, not ONE wind energy turbine has … Continue reading Offshore Wind Energy; 4 X The Energy Potential Of ALL Existing Power Plants In US Today

Department of Energy (DOE) Wants To “Recycle" Radioactively-Contaminated Metal Into Consumer Products

TELL THE DEPT OF ENERGY: "Recycling" with radioactive materials is NOT acceptable!The Department of Energy (DOE) is considering a plan to allow radioactively-contaminated metal from nuclear weapons facilities to be “recycled.” This would allow this toxic metal to be mixed with clean recycled metal and enter into normal commerce—where it could be turned into anything … Continue reading Department of Energy (DOE) Wants To “Recycle" Radioactively-Contaminated Metal Into Consumer Products